Its 03.00 AM and we start to pump

31 Jan

Lets go guys for safety meeting, the client is waiting for us at muster point. Suddenly everybody stood up and walked to the muster point. Ok, mr. client lets held the safety meeting. It was 03.00 and we finished mixing chemical and ready to pump. Safety meeting was done and..

Soraya, you call the job!

Whaaat?? I cant believe it, I did not prepare myself for that kind of task.

Its ok Ya, its not that bad, you can do it, someone start to talk.

So, where are you gonna be?

Outside.

Hmm Ok, just wish me luck then.

Radio check, radio check, are you ready every body? Please line up for main job and confirm the valve. Wellhead valve is open, circulation line is close, and bleed of line is close. We were going to fill up tubing first with brine and once we got the pressure, switched to solvent preflush. I will inform you from fraccat. It was last for 1.5 hours, we could pump at 4bpm so it was quite fast. Client was asking me a lot of question during the job. DAMN you. Now i hope the production increase and they will happy to use our service. Good job guys. Thanks.

Last, they leave me again for the third times 😦

It was sad to be left behind. You can see it clearly through my eyes.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: